Trust But Verify! Dealing with job challenges.
Manage episode 383757709 series 3429503
Ever had a colossal blunder on your hands that resulted in a rooftop unit curb adapter not fitting the new unit? Well, that was us. Join us as we dissect this recent debacle, from our oversight of not getting the spec sheet for the curb adapter, to dealing with a reversed supply and return situation. We'll share some hard-learned lessons on the importance of acquiring the right information beforehand, and how a simple mistake can quickly escalate into a logistical nightmare.
Moving onto delivery issues, we came across a surprise when a rooftop unit arrived earlier than expected, and had been opened even before delivery. Throw in a poorly packaged boiler to the mix, and you have a recipe for frustration. But there's always a silver lining in these experiences. We'll share how these predicaments reinforced the necessity of equipment verification, preventive measures, and the significance of addressing such issues head-on to prevent them from recurring. So tune in, as we share our experiences and the lessons we've learned from these recent challenges in the field.
Send us your feedback or topic ideas over on our social channels!
Eric Aune @mechanicalhub
Andy Mickelson @mick_plumb
Check out our website: mechanical-hub.com
Kapitler
1. Equipment Issues With Rooftop Units (00:00:00)
2. Delivery Issues With Equipment (00:11:55)
3. Disappointment Over Damaged Boiler Packaging (00:15:04)
316 episoder